Blackland (972) 555-0164

Rockwall, Texas · Gunite since 2009

The best hour on your
property is the one
after the sun goes down.

We build engineered gunite shells on Rockwall's blackland clay, the soil that cracks open every August and swells shut every spring. Seventeen years, 640 pools, one crew that has never been subbed out to strangers.

Complete builds start at $78,000 shell, decking, equipment and start-up included. We will say that number on the phone before you give us your address.

Pools built
640
Typical build
11 weeks
Crews on payroll
3
Shell warranty
Lifetime

The designer

Build it before we break ground.

Drag to orbit. Every figure on the readout moves the instant you move a control, including the one nobody publishes: what the thing costs to run in a Rockwall July.

Loading the water

Drag to orbit · pinch or scroll to zoom

Water surface 392 sq ft
Volume 13,700 gallons
Perimeter 84 linear ft
Build time 11 weeks

Budget band

$88,500 to $110,000

Turnkey. Shell, decking, coping, equipment, start-up, permits and cleanup.

Monthly running cost

$54 to $88

  • Variable speed pump$18
  • Salt cell and chemistry$27
  • July evaporation top-off$12

Summer figure at 10 hours of filtration a day, Oncor delivered rate of 15.1¢ per kWh and Rockwall water at $6.40 per thousand gallons. December runs roughly 45 percent of this.

This is an estimate, not a quote. A quote needs a soil report, a survey, your utility locations and an afternoon in your backyard. This gets you within about 12 percent, which is close enough to decide whether to keep reading.

Shape
Size
Depth profile
Interior finish
Water features
Decking
Talk to Dale

Eleven weeks

What actually happens in your backyard.

Weather moves this. So does the City of Rockwall inspector's calendar. But this is the sequence, and if week six comes and goes without decking forms, you should call us and ask why.

  1. Week 01

    Layout and excavation

    We paint the shell on your grass, you walk it, you move it. Then a mini excavator and a skid steer take out 90 to 160 cubic yards of black clay. Two days, four dump trucks, and the yard looks like a crime scene by lunch.

  2. Week 02

    Steel

    Number four rebar on eight inch centers through the floor and walls, doubled in the bond beam. On this soil we do not build to code minimum. Code minimum is written for Florida sand.

  3. Week 03

    Plumbing and electrical rough

    Two inch suction, two and a half inch returns, dedicated lines to every feature. Bonding grid tied to the steel. City inspection before anything gets covered.

  4. Week 04

    Gunite

    One continuous shoot, 6:30 in the morning, done by early afternoon. Twelve inch floor, ten inch walls, cut and carved by hand while it is still green. This is the day the pool stops being a hole.

  5. Week 05

    Cure

    You water the shell twice a day for seven days. It feels absurd. It is the single cheapest thing you can do to keep the concrete from crazing, and in a Rockwall summer it matters more than anything else in this list.

  6. Week 06

    Tile and coping

    Waterline tile set, coping set on the bond beam, expansion joint packed. Six inches of stone that people will look at every day for twenty years, so we do not rush it.

  7. Week 07

    Deck forms and base

    Grade, compact, form, and set the sub-base. Slopes pitched away from the house at a quarter inch per foot so nothing sheets toward your foundation.

  8. Week 08

    Decking

    Pour, or set stone, depending on what you picked in the designer. Concrete gets fiber mesh and control joints on a real pattern, not wherever the finisher felt like cutting.

  9. Week 09

    Equipment and masonry

    Pad poured, variable speed pump, cartridge filter, salt cell, automation. Raised walls and spa stone go up this week if you have them.

  10. Week 10

    Interior finish

    Acid wash, then plaster or pebble blown in and troweled the same day. The crew works fast because the material does not wait. Twelve hours later we start filling.

  11. Week 11

    Fill, start-up and handover

    Thirty hours on a garden hose, then a licensed start-up: brush twice a day, balance the chemistry over four visits, teach you the automation app. We do not hand over a pool with a startup company's phone number on a sticker.

Published pricing

Three ways this goes.

Rockwall pool pricing is a closely guarded secret for exactly one reason, and it is not a good one. Here are our three tiers, everything included, 2026 numbers.

Foundation

$78,000 to $105,000

A properly engineered shell with nothing decorative on it. This is not a stripped build, it is an honest one.

  • Up to 14 × 28, standard depth
  • White plaster, 6 inch waterline tile
  • Broom finish concrete, 4 ft surround
  • Variable speed pump, cartridge filter
  • Salt chlorination, basic automation
  • LED light, permits, start-up

Where most Rockwall builds land

Signature

$105,000 to $168,000

Pebble interior, real stone, and one or two features that make the backyard feel designed instead of installed.

  • Up to 16 × 36, any shape in the designer
  • Pebble interior, glass or stone tile
  • Travertine or paver decking, 6 to 8 ft
  • Tanning ledge with bubblers
  • Raised spa with spillway, gas heater
  • Color LED, full phone automation
  • Sheer descents or deck jets

Estate

$168,000 to $340,000

Structural engineering on grade changes, negative edges, and the kind of stonework that needs a mason on site for three weeks.

  • 18 × 42 and up, custom geometry
  • Vanishing edge with catch basin and surge tank
  • Full flagstone or large format porcelain
  • Outdoor kitchen and fire feature tie-in
  • Retaining walls, engineered and stamped
  • Heat pump plus gas, two body automation

What moves a number inside its band: how far the truck has to reach, whether we hit the limestone shelf that runs under the north side of Rockwall, how much fall there is from your slab to the shell, and whether your gas meter can carry a 400,000 BTU heater without an upgrade from Atmos.

Warranty

The whole thing fits on this page.

There is no page two, no registration window you will miss, and no clause that voids it because you let the water level drop in August.

Gunite shell, structural
Lifetime to you, transferable once to the next owner of the house.
Pebble interior finish
20 years against delamination and loss of aggregate.
Quartz and plaster interior
10 years, prorated after year five.
Plumbing and workmanship
3 years, including the decking and any leak we caused.
Tile, coping and stone set
2 years on the setting, lifetime on the layout being square.
Equipment
Manufacturer's term. We register every serial number for you the week it is set, because roughly half of homeowners never do.

Who shows up

Six people, and you will meet four of them.

Texas does not license pool builders. Anyone with a truck can sell you a hole in the ground, which is why the letters after these names are worth reading.

  • Dale Whitcomb

    Founder, construction lead

    CPO · PHTA Certified Building Professional

    Shot his first gunite pool in Garland in 1998. Started Blackland in 2009 after two seasons of watching another builder's shells crack on this clay.

  • Maribel Ochoa

    Design lead

    PHTA Certified Building Professional · CPO

    Draws every plan that leaves this office. If the designer on this page told you 14 by 28, Maribel is the one who will tell you your gas line cannot support the heater you want.

  • Trey Landrum

    Superintendent

    CPO · OSHA 30

    On every site every day from dig to plaster. Texts you a photo each afternoon whether anything happened or not, because silence is the thing homeowners hate most.

  • Renata Salas

    Water chemistry and service

    CPO · PHTA Certified Service Technician

    Runs the four visit start-up and handles the first year of questions. She is the reason our plaster mottling complaints dropped to nearly nothing after 2019.

The awkward questions

Asked before you have to.

Who pulls the permit, and how long does the City of Rockwall take?

We pull it. You never touch it. Rockwall reviews residential pool permits in roughly eight to twelve business days when the plan set is clean, and we submit the engineered shell drawings with the application so it does not bounce back for a revision.

Two things surprise people. First, the barrier and self-closing gate hardware has to be in place before final, and a door alarm is required on any door from the house into the pool area unless you have an approved alternative. Second, the electrical is a separate inspection from the pool, so a slow electrician can hold up your final by a week even when the water is already blue.

My HOA has to approve it. How bad is that?

Chandlers Landing, The Shores and Stone Creek all want an ARC packet before you dig, and their committees meet monthly, not weekly. That is the real cost: a missed meeting is thirty days, not thirty minutes.

We build the packet: site plan with setbacks, shell dimensions, equipment pad location with a sound note, decking material sample, drainage direction, and the construction access route with a fence protection plan. Send us your HOA's name when you call and we will tell you which of those they actually care about. The Shores wants the equipment screened. Chandlers Landing cares most about which side the trucks come in from.

What happens if you hit rock?

North of I-30 and up toward the lake, there is a limestone shelf that sits anywhere from four to nine feet down. When the dig reaches it you have three options and all of them cost money, so we would rather find it before you sign.

We probe. Two to four test holes with a hydraulic auger before contract, at our cost, on any lot north of the interstate or on any lot where the neighbor's build hit rock. If we find it, your agreement gets a rock clause with a stated number in it, typically $1,800 for light hammering up to $9,500 for a full day of breaker work and extra haul-off. If we do not find it and it turns up anyway, we split the difference with you up to the first $2,500. We have written that into every contract since 2014 and it has cost us about eleven thousand dollars total, which is less than one lost customer.

Will this clay crack my shell?

Blackland Prairie clay has a plasticity index north of 40. It moves four to six inches vertically between a wet March and a dry September, and it is the reason foundation repair is a growth industry in this county.

A gunite shell handles it if it is built as a monolithic structure and not as a floor with walls attached. Ours are shot in one continuous pour with a twelve inch floor, ten inch walls, doubled steel in the bond beam and a hydrostatic relief valve at the deep end. The decking is the part that actually cracks on this soil, which is why we form real control joints on a pattern and use a compressible expansion joint at the coping instead of caulking over a hard seam.

Can I keep my yard usable during the build?

Partly, and we will be honest about which weeks are bad. Excavation week and gunite day are loud, dusty and involve trucks on your grass. We lay ground protection on the access route, fence the open shell the day it is dug, and haul debris weekly rather than letting a pile grow.

Your sprinkler heads in the access path will get cut. We cap and reroute them as part of the build, not as a change order, and we replace the sod on the route at the end.

What does it cost to run in a Rockwall summer?

The designer above gives you a live figure for the pool you just drew, but the short version for a standard 14 by 28: about $61 to $104 a month from June through September, and roughly 45 percent of that in December.

The three pieces are the pump, the chemistry and the water. A variable speed pump running ten hours at low RPM costs about $21 a month at the current Oncor delivered rate. Salt cell amortization, acid and stabilizer run $22 to $38. And in July this county evaporates about a quarter inch a day off the surface, which on a 392 square foot pool is roughly 2,100 gallons a month, or $13 on your Rockwall water bill. A single speed pump instead of a variable would roughly triple the first number, which is why we do not sell one.

How far out are you booking?

We run three crews and hold about fourteen builds in the schedule at once. Signing today generally puts your dig four to seven weeks out in winter and eight to fourteen weeks out between March and June, when everyone in this county decides at the same time that they want a pool by Memorial Day.

Winter builds are cheaper for us to run and we pass some of that back. A December dig is typically three to five percent under the same build in April.

Dale Whitcomb

Founder, construction lead

CPO · PHTA Certified Building Professional

7:00am to 6:00pmMonday through Saturday

Who picks up

Dale answers this phone himself.

Not a call centre. Not a lead service that sold your number to four builders before lunch. Not a salesman on commission who has never held a trowel. The man who will be standing in your backyard on dig day is the man who answers, and if he is in a hole with a hose in his hand he will call you back before the end of the day.

He will ask you three things: where you live, what the fall is from your slab to the back fence, and what you were hoping to spend. Then he will tell you on that first call whether those three answers agree with each other. Most builders make you sit through a two hour appointment to hear that. It takes him about four minutes.

1408 E Interstate 30, Suite 210, Rockwall, TX 75087 · Building in Rockwall, Heath, Fate, Royse City, Rowlett and Wylie